Project Experience
Project Type:
Installation of
Emergency Response and Permanent Systems at Petroleum Bulking
Facility
- 24 hour rapid response team.
- Installation of Mobile tower for stripping
and oil/water separation.
- Installation completed in 3 days.
Permanent System
- Dewatering and air stripping system.
- 4 water "knock-out" units.
- 14 recovery wells.
- Installed pumping and treatment system with
50 gpm (gallon per minute) capacity, over 47MM gallons treated to date.
- Oil/water separator, also with 50 gpm
separation rate.
- Vapour recovery rate 13.3 cfm (cubic feet
per minute), over 50MM cf treated to date.
- Complete with hydrocarbon-contaminated
water and air vacuum recovery system.
- Installation completed in 3 weeks.
See also
Environmental
Services
Or
Environmental
Equipment |

Installation of emergency response pump and treat system at
hydrocarbon - contaminated site.
System Components:

Contaminated
water treatment tank

Air /
Water stripping tower |