Project Experience

Project Type:

Installation of Emergency Response and Permanent Systems at Petroleum Bulking Facility

  • 24 hour rapid response team.
  • Installation of Mobile tower for stripping and oil/water separation.
  • Installation completed in 3 days.

Permanent System

  • Dewatering and air stripping system.
    • 4 water "knock-out" units.
    • 14 recovery wells.
  • Installed pumping and treatment system with 50 gpm (gallon per minute) capacity, over 47MM gallons treated to date.
  • Oil/water separator, also with 50 gpm
    separation rate.
  • Vapour recovery rate 13.3 cfm (cubic feet per minute), over 50MM cf treated to date.
  • Complete with hydrocarbon-contaminated water and air vacuum recovery system.
  • Installation completed in 3 weeks.

 

See also

Environmental Services

Or

Environmental Equipment

 

 

 

Installation of emergency response pump and treat system at hydrocarbon - contaminated site.

 

System Components:

Contaminated water treatment tank

Air / Water stripping tower

   

 

 